Сейчас строим - 696 174 м2
Сейчас строим - 696 174 м2 +7 (861) 258-36-61
Krasnodar
Infrastructure facilities

RTE

In 2015, a boiler house with a capacity of 14.8 MW was commissioned, providing heat and hot water to the residential area of Red Square, the Expograd Yug exhibition center, and the Four Points by Sheraton Hotel.

The boiler house is equipped with modern technological equipment, automation and dispatching systems. 4 independent boilers, 3.2 gcal each, ensure trouble-free and uninterrupted operation of the enterprise.